| 1 | Law | Council Directive 89/391/EEC of 12 June 1989 on measures to encourage improvements in the safety and health of workers at work. Articles 6(4) and 8(3) to 8(5). | 13 | | | EU law, applied through national legislation. Articles read in the retained UK copy and confirmed in a second reproduction. |
| 2 | Law | International Labour Organization (1981). Occupational Safety and Health Convention, No. 155. Articles 13 and 19(f). | 13 | | | International treaty. Legal effect depends on ratification and national law. Text read in several reproduced copies. The official page did not load on the day. |
| 3 | Law | Regulation (EU) 2023/1230 of the European Parliament and of the Council of 14 June 2023 on machinery. | 4 | | Yes | Law. Read through the summary of the European Agency for Safety and Health at Work and the European Parliament’s summary of the final act, 19 November 2026. The regulation itself was not opened. |
| 4 | Law | Regulation (EU) 2024/1689 of the European Parliament and of the Council of 13 June 2024 laying down harmonised rules on artificial intelligence (AI Act). Articles 6, 14 and 26 and Annex III, as amended. | 4 | | | Law. Articles 6, 14 and 26 and Annex III read on the European Commission’s AI Act service desk on 19 November 2026. Paraphrased. The authentic text is the Official Journal. |
| 5 | Law | Regulation (EU) 2026/1744 of the European Parliament and of the Council of 8 July 2026 amending Regulations (EU) 2024/1689, (EU) 2018/1139 and (EU) 2023/1230 (Digital Omnibus on AI). Official Journal L, 24 July 2026. | 4 | | | Law. EUR-Lex record read on 19 November 2026 for dates of adoption and entry into force (27 July 2026). The amendment to Article 113 was read in a reproduction of the official text and the two dates were confirmed in three law-firm notes and a Portuguese government notice. The same regulation moves machinery within Annex I of the AI Act. We do not analyse that change. |
| 6 | Law | Republic of South Africa (2015). Mine Health and Safety Act, 1996: regulations relating to machinery and equipment, regulation 8.10. Government Notice R.125, Government Gazette 38493, 27 February 2015. | 1 | | | National regulation. Applies where there is a significant risk of collision. Text read. Commencement of the automatic-braking sub-regulations on 21 December 2022 confirmed in two legal and trade reports. |
| 7 | Regulator or agency | Brabazon, P. and Conlin, H. (2001). Assessing the safety of staffing arrangements for process operations in the chemical and allied industries. Contract Research Report 348/2001, for the UK Health and Safety Executive. | 3 | | | Research report commissioned by a regulator. First part read in a hosted copy on 19 November 2026. Data older than three years. The method remains the regulator’s reference. |
| 8 | Regulator or agency | European Agency for Safety and Health at Work (2024). Principles for implementation and use: smart digital systems to improve workers’ safety and health. | 12 | | | EU agency guidance. Read. |
| 9 | Regulator or agency | UK Health and Safety Executive (2006). Developing process safety indicators: a step-by-step guide for chemical and major hazard industries. HSG254. | 123 | | | Regulator guidance. Read for Time to act. Not re-opened. |
| 10 | Regulator or agency | UK Health and Safety Executive (2013). Avoiding danger from overhead power lines. Guidance Note GS6, fourth edition. | 2 | | | Regulator guidance. Publication page and text extracts read on 19 November 2026. |
| 11 | Regulator or agency | UK Health and Safety Executive. Alarm management. Human factors topic guidance. | 12 | | | Regulator guidance. Read on 19 November 2026. |
| 12 | Regulator or agency | UK Health and Safety Executive. Fragile surfaces. Construction safety topic guidance. | 12 | | | Regulator guidance. Read. |
| 13 | Regulator or agency | UK Health and Safety Executive. HSE’s regulatory approach to artificial intelligence (AI). | 4 | | | Regulator statement, Great Britain. Read in November 2026. On 19 November the page redirected to the regulator’s press site. The risk-assessment expectation is confirmed in two legal commentaries. |
| 14 | Regulator or agency | UK Health and Safety Executive. Lifting operations. Construction safety topic guidance. | 12 | | | Regulator guidance. Read. |
| 15 | Regulator or agency | UK Health and Safety Executive. Shift handover. Human factors topic guidance. | 34 | | | Regulator guidance. Read on 19 November 2026. |
| 16 | Regulator or agency | UK Health and Safety Executive. Staffing levels. Human factors topic guidance. | 3 | | | Regulator guidance. Read on 19 November 2026. |
| 17 | Regulator or agency | UK Health and Safety Executive. Temporary works. Construction safety topic guidance. | 12 | | | Regulator guidance. Read. |
| 18 | Regulator or agency | UK Health and Safety Executive. Traffic management on site. Construction safety topic guidance. | 12 | | | Regulator guidance. Read. |
| 19 | Regulator or agency | US Occupational Safety and Health Administration (2005). Hazards of inadequately securing hydraulic excavator buckets when using quick coupling devices. Safety and Health Information Bulletin SHIB 07-22-2005. | 2 | | | Regulator bulletin, advisory. Extracts read. Incident and fatality counts confirmed in the 2004 bulletin and two trade reports. Data older than three years. |
| 20 | Regulator or agency | US Occupational Safety and Health Administration. Recommended practices for safety and health programs: worker participation. | 3 | | | Regulator guidance, not a legal requirement. Read on 19 November 2026. |
| 21 | Regulator or agency | Workplace Health and Safety Queensland (2011). Hose whip on concrete pumps. Safety alert, 16 March 2011. | 2 | Yes | | Regulator alert. Extract read on 19 November 2026. Single source for the fatality described. |
| 22 | Regulator or agency | Workplace Health and Safety Queensland (2025). Piling rig concrete pumping hose whip fatality. Safety alert, 1 August 2025. | 2 | | | Regulator alert. Extract read on 19 November 2026. |
| 23 | Official investigation | California Fatality Assessment and Control Evaluation Program (2000). A construction flag person dies after being backed over by a truck. FACE report 00CA006. | 12 | | | Official investigation. Confirmed against the California Department of Public Health copy. |
| 24 | Official investigation | Independent Forensic Team (2018). Oroville dam spillway incident. Report of 5 January 2018, as summarised in the Association of State Dam Safety Officials case study. | 3 | | Yes | Independent investigation. Summary and sections 3 and 4 of the forensic team’s report read on 20 November 2026, for the dates, the evacuation figure and the organisational findings. The rest of the 584-page report was not read. |
| 25 | Official investigation | National Commission on the BP Deepwater Horizon Oil Spill and Offshore Drilling (2011). Deep water: the Gulf oil disaster and the future of offshore drilling. Report to the President, January 2011. | 1 | | | Official inquiry. Findings on the pressure test and root cause read in Oil & Gas Journal’s report of the Commission’s findings (12 January 2011), not in the report itself. Death toll confirmed in the report’s dedication. |
| 26 | Official investigation | US Chemical Safety and Hazard Investigation Board (2007). Refinery explosion and fire, BP Texas City, March 23, 2005. Investigation report 2005-04-I-TX, with the Board’s summary of findings, 20 March 2007. | 13 | | Yes | Official investigation. Sections 1 and 2 of the final report read on 20 November 2026, with page references for each fact we cite. The rest of the 341-page report was not read. Casualties and the cost-cutting finding are also confirmed in the CSB chairman’s 2007 congressional testimony. |
| 27 | Official investigation | US Chemical Safety and Hazard Investigation Board (2015). Chevron Richmond refinery pipe rupture and fire, August 6, 2012. Final investigation report 2012-03-I-CA. | 3 | | | Official investigation. Sections 1 to 3 read on 19 November 2026. Casualty and treatment figures confirmed in the Board’s news releases. Times are approximate in the report. |
| 28 | Official investigation | US Chemical Safety and Hazard Investigation Board (2018). Packaging Corporation of America hot work explosion, DeRidder, Louisiana. Report 2017-03-I-LA. | 12 | | Yes | Official investigation. First half of the final report read on 20 November 2026, including the findings on gas testing, the casualties and ownership of the tank. |
| 29 | Official investigation | US Chemical Safety and Hazard Investigation Board (2019). DuPont La Porte facility toxic chemical release. Final report released 25 June 2019. | 12 | | Yes | Official investigation. Opening sections of the final report read on 20 November 2026, including the sequence of the four deaths and the finding on the bonus structure. Detail on responders is also confirmed in two trade reports of the CSB findings. |
| 30 | Official investigation | US National Transportation Safety Board (2019). Pedestrian bridge collapse over SW 8th Street, Miami, Florida, March 15, 2018. Highway Accident Report NTSB/HAR-19/02. | 123 | | | Official investigation. Investigation page and digest read on 19 November 2026. Probable cause confirmed in trade press coverage of the board meeting. |
| 31 | Standard or framework | ISO/IEC 42001:2023. Information technology. Artificial intelligence. Management system. Edition 1, December 2023. | 4 | | Yes | International standard. Catalogue page read on 19 November 2026. The standard itself was not read. Cited for its existence and scope only. |
| 32 | Standard or framework | ISO/IEC TR 5469:2024. Artificial intelligence. Functional safety and AI systems. Edition 1, January 2024. | 4 | | Yes | International technical report. Abstract and scope read on the ISO catalogue page on 19 November 2026. The full document was not read. |
| 33 | Standard or framework | US Mine Safety and Health Administration (2015). Proximity detection systems for continuous mining machines in underground coal mines. Final rule, 80 FR 2188. | 1 | | Yes | US regulation. Agency summary read. It reports no outcome data since the rule took effect. |
| 34 | Standard or framework | US National Institute of Standards and Technology (2023). Artificial Intelligence Risk Management Framework (AI RMF 1.0). NIST AI 100-1. | 14 | | | Voluntary framework. Appendix C on human and AI interaction read on 19 November 2026. |
| 35 | Standard or framework | US National Institute of Standards and Technology (2024). Artificial Intelligence Risk Management Framework: Generative Artificial Intelligence Profile. NIST AI 600-1, July 2024. doi:10.6028/NIST.AI.600-1. | 4 | | Yes | Voluntary framework. Publication confirmed on the NIST notice. The two risk descriptions were read in a legal summary of the document and matched against its table of contents. The full text was not re-read. |
| 36 | Standard or framework | US Occupational Safety and Health Administration. 29 CFR 1910.147, The control of hazardous energy (lockout/tagout). Scope exclusion at paragraph (a)(1)(ii)(A). | 12 | | | US regulation. Read. |
| 37 | Standard or framework | US Occupational Safety and Health Administration. 29 CFR 1926.1204, Permit-required confined space program. | 12 | | | US regulation. Read. |
| 38 | Standard or framework | US Occupational Safety and Health Administration. 29 CFR 1926.417, Lockout and tagging of circuits. | 12 | | | US regulation. Read. |
| 39 | Standard or framework | US Occupational Safety and Health Administration. 29 CFR 1926.651, Specific excavation requirements. | 12 | | | US regulation. Read. |
| 40 | Government research | NIOSH researchers. Proximity detection zones: designs to prevent fatalities around continuous mining machines, and a further NIOSH paper on electronic interference with proximity detection systems. | 1 | | | Government research. Retrospective review of 39 fatalities between 1984 and 2015. Article read in full in the CDC repository copy on 20 November 2026. The authors state that the incident data are too few for statistically validated conclusions. |
| 41 | Peer-reviewed | Awolusi, I., Marks, E. and Vereen, S. (2017). Qualifications and staffing requirements of safety personnel in construction. Practice Periodical on Structural Design and Construction 22(4). doi:10.1061/(ASCE)SC.1943-5576.0000328. | 3 | Yes | Yes | Peer-reviewed survey. Abstract read. Sample size not visible to us. Single source. |
| 42 | Peer-reviewed | Bainbridge, L. (1983). Ironies of automation. Automatica 19(6), 775 to 779. doi:10.1016/0005-1098(83)90046-8. | 4 | | Yes | Peer-reviewed paper, process industries. Abstract and opening sections read. Bibliographic details confirmed in two indexes. |
| 43 | Peer-reviewed | Clarke, S. (2013). Safety leadership: a meta-analytic review of transformational and transactional leadership styles as antecedents of safety behaviours. Journal of Occupational and Organizational Psychology 86(1), 22 to 49. doi:10.1111/j.2044-8325.2012.02064.x. | 1 | | Yes | Peer-reviewed meta-analysis. Abstract read, confirmed in a US government patient-safety digest. |
| 44 | Peer-reviewed | Fugate, H. and Alzraiee, H. (2023). Quantitative analysis of construction labor acceptance of wearable sensing devices to enhance workers’ safety. Results in Engineering 17, 100841. doi:10.1016/j.rineng.2022.100841. | 12 | Yes | | Peer-reviewed survey, United States. Full text read on 20 November 2026. The article does not state the size of its main sample. Respondents were recruited by convenience and snowball sampling, mostly in the western United States. Single source. |
| 45 | Peer-reviewed | Hanley, J. and Lippman-Hand, A. (1983). If nothing goes wrong, is everything all right? Interpreting zero numerators. JAMA 249(13), 1743 to 1745. doi:10.1001/jama.1983.03330370053031. | 24 | | Yes | Peer-reviewed. Abstract read. The rule is confirmed in a later JAMA letter and a BMJ note. The exact figures in this manual are our own calculation. |
| 46 | Peer-reviewed | Li, L., Huang, Z., Wang, J., Du, B. and Dai, L. (2026). Automated construction monitoring based on computer vision: a comprehensive review. Developments in the Built Environment 25, 100832. doi:10.1016/j.dibe.2025.100832. | 12 | Yes | Yes | Peer-reviewed review. Abstract, highlights and introduction read. Single source. |
| 47 | Peer-reviewed | Parasuraman, R. and Manzey, D. (2010). Complacency and bias in human use of automation: an attentional integration. Human Factors 52(3), 381 to 410. doi:10.1177/0018720810376055. | 4 | Yes | Yes | Peer-reviewed review. Abstract read. Laboratory and aviation evidence, before language-model agents. Single source for the findings quoted. |
| 48 | Peer-reviewed | Ruff, T. (2006). Evaluation of a radar-based proximity warning system for off-highway dump trucks. Accident Analysis & Prevention 38(1), 92 to 98. doi:10.1016/j.aap.2005.07.006. NIOSH Spokane Research Laboratory. | 12 | | | Primary field study. One truck, one mine, seven days. Full text read. |
| 49 | Peer-reviewed | Trask, C. and Linderoth, H. (2023). Digital technologies in construction: a systematic mapping review of evidence for improved occupational health and safety. Journal of Building Engineering 80, 108082. doi:10.1016/j.jobe.2023.108082. | 12 | | Yes | Peer-reviewed mapping review. Article read on the publisher’s open-access page on 20 November 2026. Counts confirmed in a second listing (ENETOSH). |
| 50 | Peer-reviewed | Tucker, A. and Singer, S. (2015). The effectiveness of management-by-walking-around: a randomized field study. Production and Operations Management 24(2), 253 to 271. doi:10.1111/poms.12226. | 13 | | | Peer-reviewed randomised field study, hospitals. Open-access manuscript read in full, most recently on 20 November 2026. The abstract reports 19 hospitals. The methods section reports 24 selected and 20 that completed the programme. We cite the abstract. |
| 51 | Peer-reviewed | Zohar, D. and Polachek, T. (2014). Discourse-based intervention for modifying supervisory communication as leverage for safety climate and performance improvement: a randomized field study. Journal of Applied Psychology 99(1), 113 to 124. doi:10.1037/a0034096. | 13 | | Yes | Peer-reviewed randomised field study. Abstract read. Plant size from the first author’s 2014 conference presentation. |
| 52 | Peer-reviewed | van der Molen, H. et al. (2018). Interventions to prevent injuries in construction workers. Cochrane Database of Systematic Reviews, CD006251.pub4. | 12 | | Yes | Systematic review, search to April 2017. Cochrane summary read. Data older than three years. |
| 53 | Preprint | O’Donncha, F., Zhou, N., Martinez, N., Rayfield, J., Heath, F., Langbridge, A. and Vaculin, R. (2026). Evidence-driven reasoning for industrial maintenance using heterogeneous data. arXiv:2603.08171, 9 March 2026. | 4 | Yes | Yes | Preprint by the system’s developers. A version appears in the industry track of a 2026 computational linguistics conference. Abstract read on 19 November 2026. Cited to show that deployments exist. Single source. |
| 54 | Consultancy paper | Robnett, S., Lukic, V., De Bellefonds, N. and Crews, C. L. (2026). Building an agent-first organization: five operating model principles from a 99% agentic enterprise. Whitepaper, Boston Consulting Group, October 2026. | 4 | Yes | | Consultancy paper, cited as the position examined and never as evidence for a recommendation. Seen on LinkedIn on 19 November 2026 and downloaded there as a PDF, then read in full. Not found on the publisher’s website on that date, so no direct link is given. All figures are as printed in that document. Single source. |
| 55 | Own report | Hounkpati, B. (2026). Critical control health (CCHI): methodology proposal, last reviewed 16 September 2026, and The CCHI rollout playbook. Riskopilot. | 123 | | | Riskopilot’s own method. Read on 19 November 2026. “Critical control” is used as in the mining industry’s good practice guide, which we did not re-open. |
| 56 | Own report | Hounkpati, B. (2026). Time to act, Prove it on site and Who can act in time. Riskopilot Research, critical controls series. | 4 | | | Our own earlier reports. Cited for definitions and methods, not as independent evidence. |
| 57 | Own report | Hounkpati, B. (2026). Time to act: what technology can and cannot add to critical controls. Riskopilot Research, critical controls series. | 23 | | | Riskopilot’s own report. The five gates and the four levels of proof are set out there. |