Methodology · step-chart

    What is a STEP chart?

    A STEP (Sequentially Timed Events Plotting) chart maps each actor's actions on a horizontal timeline, exposing convergence points where multiple actors interact. It is essential for multi-party incidents like vessel collisions or process upsets.

    Developed by Kingston in the 1980s for transport accidents, STEP charts solve the problem narrative reports cannot: showing who did what, in parallel, at exactly which second. Multi-actor incidents — bridge collisions, control-room handovers, simultaneous operations — become legible.

    BY RiskoPilot Editorial Team · REVIEWED 2026-06-20

    How it works

    1. STEP 01

      List actors

      Identify every person, system or piece of equipment that took an action during the incident window.

    2. STEP 02

      Build the timeline axis

      Choose granularity (seconds, minutes) and span. Anchor with reliable timestamps from logs or CCTV.

    3. STEP 03

      Place each event on its actor row

      Each action becomes a node tied to its actor and exact time.

    4. STEP 04

      Draw causation links

      Connect events that influenced each other across actors using arrows.

    5. STEP 05

      Highlight convergence and gaps

      Mark moments where actors collided, miscommunicated or where information was missing.

    Frequently Asked Questions

    Run a free investigation

    Tripod Beta report in under 5 minutes.

    Free audit